Precision Porcelain Façade Installation


At Beirut–Rafic Hariri International Airport, Arcus Solutions’ scope for Middle East Airlines’ Staff Services & Recreational Building covers approximately 5,000 m² of mechanically fixed porcelain façade cladding.


Working alongside main contractor MAN Enterprise, with architectural design by Joe Farah, our team brings specialist installation expertise to this large-scale project.


The façade features an invisible clamp system, securing the porcelain panels to an aluminum substructure using concealed stainless steel 316 clips. This approach maintains clean architectural lines while keeping the fixation concealed.


Panel preparation combines dedicated slotting equipment with Italian water bridge cutting machines, supporting accurate cuts, consistent grooves, and precise alignment throughout the installation.


Project Details


Client: Middle East Airlines (MEA)


Location: Beirut–Rafic Hariri International Airport, Lebanon


Architect: Joe Farah


Main Contractor: MAN Enterprise


Arcus Solutions’ Scope: Mechanical installation of porcelain façade cladding


Façade Area: Approximately 5,000 m²


Fixation System: Invisible clamps with stainless steel 316 clips and aluminum substructure


Arcus Solutions — Solutions Beyond the Surface

Other Projects

Middle East Airlines Staff services and recreational building

The Black Ember

The Orchard

Villa S.Z

Villa Husseini

Aura 425

La Maison Ivoire

Henry's Restaurant-Nicosia

Abi Habib Residence

Engineered Marble Flooring- Limassol

Marble Finishing